Background
The Eastern Creek Industry Park is a strategically located logistics and industrial precinct developed by ESR Group, one of the regio n’s largest logistics real estate platforms. With Hindmarsh Constructions appointed as the principal builder, the project demanded robust safety infrastructure to support heavy vehicle movement and pedestrian activity across the site.
Scope of Supply
Guard-R Group was engaged to supply over 560 metres of Kwik-Guard™ guardrail to meet the project’s access safety requirements. The Kwik-Guard system was selected for its rapid installation capability, modular design, and compliance with Australian safety standards.
Supplied Products:
- 275 metres of Kwik-Guard Double Height Guardrail – Class 1
- 230 metres of Kwik-Guard Single Height Guardrail – Class 1
- 55 metres of Kwik-Guard Single Height Guardrail – Class 2
Why Kwik-Guard?
The Kwik-Guard system was chosen for its:
- AS/NZS 1170.1 compliant design
- Modular installation system, reducing site disruption
- Corrosion resistance, ideal for long-term use in industrial settings
- Options for single and double height configuration, tailored to risk levels across different zones
Challenges & Solutions
Challenge:
Ensuring safety compliance across a high-traffic industrial estate without delaying the builder’s tight construction schedule.
Solution:
Guard-R Group’s Kwik-Guard system allowed for rapid delivery and modular installation, helping Hindmarsh Constructions maintain project momentum while upholding site safety.
Outcome
Guard-R Group’s involvement contributed to a safer worksite at Eastern Creek Industry Park, aligning with ESR Group’s commitment to quality, safety, and long-term durability. The guardrail system now plays a vital role in protecting infrastructure and personnel throughout the estate.